REFERENCES

REFERENCES

TUNNEL


  • 2007 OSMO Anlagenbau AG & Co.KG New Stuttgart Trade Fair Center tunnel and apron traffic control system
  • cable routing
  • assembly and connection work
  • 2007 OSMO Anlagenbau AG & Co.KG Tunnel Menkhausener Berg L751
  • cable routing
  • 2020 S21 - Albvorland Tunnel
  • Calibration KSR 330 km

You can find some pictures of our projects under Impressions.

INDUSTRIAL PLANTS


2005-2007 Heldele AG Stadtwerke Aalen Kabeleinblasen
2006-2007 Cegelec AT AG & Co.KG DHL Airport Halle-Leipzig 400Hz cabling, installation of frequency converter
2007 FNT AG Federal Armed Forces Airport Schwesig cable routing
2012 FNT AG Stadtwerke Neumünster Civil engineering work, calibration, fiber optic blowing in, cable assembly/splicing work
2012 LWL cable route Schafflund, Linnau, Lindewitt Civil engineering work, calibration, fiber optic blowing
2012 vitronet projects AG Telecommunication route expansion Friedrichsdorf Laying multiple pipes, laying multipipes, fiber optic blowing
2012 LWL - Kabeltrasse Linnau, Lindwitt, Nordhackstedt Civil engineering work, cable trenches, laying empty pipes
2013 Arning Bauunternehmung AG wind farm Bad Langensalza Fiber optic cable laying, fiber optic splicing, OTDR measurements
2013 Arning Bauunternehmung AG wind farm Elsdorf Fiber optic cable laying, fiber optic splicing, OTDR measurements
2013 Arning Bauunternehmung AG wind farm Diemelstadt Fiber optic cable laying, fiber optic splicing, OTDR measurements
2013 Arning Bauunternehmung AG wind farm Düngenheim Fiber optic cable laying, fiber optic splicing, OTDR measurements
2013 GUNVOR refinery Ingolstadt AG refinery Kösching Civil engineering, cable laying, electrical work
2016 GUNVOR refinery Ingolstadt AG refinery Kösching Civil engineering, cable laying, electrical work
2016 Service provider transport of valuables Hanover Electrical installations, 2016 service provider cash in transit Braunschweig, electrical installations
2017 Service provider cash in transit Frankfurt electrical installations

You can find out more about our completed projects at References.

LONG DISTANCES


2007-2008 FNT AG FTTH Denmark Civil engineering work, calibration, fiber optic blowing in, cable assembly/splicing work
2007 Fuchs GbR City of Trier Feeding multiple pipe
2007 SAG AG railway line Freiburg - Bruchsal Cable laying, 2012 Stadtwerke Neumünster, civil engineering work, calibration, fiber optic blowing in, cable assembly / splicing work
2012 LWL - Kabelstrasse Schafflung, Linnau, Lindewitt Civil engineering work, calibration, fiber optic blowing
2012 Telecommunications route expansion in Friedrichsdorf Laying multiple pipes, laying multipipes, fiber optic blowing
2012 Linnau, Lindwitt, Nordhackstedt cable route Civil engineering work, cable trenches, laying empty pipes, fiber optic blowing in, splicing work
2013 FNT AG LWL - Kabeltrasse Risum, Lindholm Laying speedpipes fiber optic blowing
2013 FNT AG LWL - cable routes Pinneberg, Husum, Itzehoe, Strukum Fiber optic blowing
2014 LWL - Kabeltrasse Pinneberg, Falskamp LWL blowing in, LWL splicing work, house connections
2014 Schlewswig Holstein cable route LWL blowing in, LWL splicing work
2015-2016 FNT AG fiber optic cable routes in the district of Schleswig-Flensburg LWL blowing in, LWL splicing work
2016-2017 FNT AG fiber optic cable routes in the district of Schleswig-Holstein LWL blowing in, LWL splicing work
2018 FNT AG LWL - cable routes Schlei-Ostsee-Kappeln LWL blowing in, house connections, LWL splicing work
2018 FNT AG LWL - cable routes ARGE broadband network company Fiber optic blowing, house connections. fiber optic splicing
2018 FNT AG fiber optic cable routes in the district of Osterrönfeld LWL blowing in, house connections, LWL splicing work

You can find out more about our completed projects at References.

SOLAR POWER SYSTEMS


2007 Westmontage Kabel und Netzwerk AG DE-89143 Blaubeuren shopping center 688.19 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2007 Westmontage Kabel und Netzwerk AG DE-91522 Ansbach shopping center 39.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2007 Westmontage Kabel und Netzwerk AG DE-90537 Feucht shopping center 168.90 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-86720 Nördlingen shopping center 158.34 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-55490 Gemünden shopping center 243.60 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-95326 Kulmbach shopping center 106.58 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-95349 Thurnau shopping center 77.65 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-88316 Isny residential buildings 54.60 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-91074 Herzogenaurach shopping center 96.80 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-87527 Sonthofen shopping center 51.77 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG IT-31030 Castelcucco Production hall 684.40 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling
2008 Westmontage Kabel und Netzwerk AG DE-97525 Schwebheim shopping center 36.11 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 SolarMarkt AG DE-78269 Volkertshausen Production hall 172.50 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-08297 Zwönitz shopping center 73.37 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2008 Westmontage Kabel und Netzwerk AG DE-97509 Zeilitzheim residential buildings 29.52 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Eoluz NV BE-2850 Boom Logistic Center 676.34 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 SolarMarkt AG DE-79238 Kirchenhofen logistics center 223.18 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 SolarMarkt AG DE-79539 Lörrach school center 32.78 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Westmontage Kabel und Netzwerk AG DE-95028 Hof shopping center 31.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Westmontage Kabel und Netzwerk AG DE-08294 Lößnitz shopping center 58.73 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 EuroSun AG DE-85646 Anzing Logistics Center 773.03 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, conversion of transformer station and NSHV, installation of Fraunhofer monitoring
2009 EuroSun AG DE-15537 Freienbrink logistics center 894.20 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, conversion of transformer station and NSHV, installation of Fraunhofer monitoring
2009 EuroSun AG DE-22962 Siek logistics center 439.92 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, conversion of transformer station and NSHV, installation of Fraunhofer monitoring
2009 EuroSun AG BE-8560 Wevelgem logistics center 939.06 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, installation of Fraunhofer monitoring
2009 West assembly Kabel und Netzwerk AG DE-97074 Würzburg Clinic 61.48 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 SolarMarkt AG DE-79856 Hinterzarten school center 39.38 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Ökoinvest Esslingen AG DE-70327 Stuttgart DEKRA building 98.60 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Ökoinvest Esslingen AG DE-73730 Esslingen Office building 27.70 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Ökoinvest Esslingen AG DE-73730 Esslingen Office building 62.65 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2009 Westmontage Kabel und Netzwerk AG DE- 97616 Bad Neustadt school center 81.35 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2010 EuroSun AG ES-38509 Güimar Tenerife logistic center 968.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, installation of Fraunhofer monitoring
2010 Westmontage Kabel und Netzwerk AG DE-47608 Geldern Production hall 224.82 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2010 SolarMarkt AG DE-79112 Munzingen Golf Club 30.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2010 SolarMarkt AG IT-72021 Francavilla Fontana open space 744.48 kWp Setting pile foundations, assembling substructure, assembling PV modules, assembling inverters, civil engineering work, DC wiring and connectors, AC wiring and connectors
2010 Westmontage Kabel und Netzwerk AG DE-41460 Neuss Production hall 388.80 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2010 SolarMarkt AG DE-78269 Volkertshausen Production hall 382.05 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2010 SolarMarkt AG DE-79423 Heitersheim Museum 54.28 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2010 Würth Solar AG&Co.KG DE-04347 Leipzig Open space 3,500.00 kWp Place ramming foundations, assembly of substructure, assembly of PV modules, assembly of inverters,
2010 SolarMarkt AG DE-79312 Emmendingen Therapy center 41.40 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2010 S&F Umwelttechnik AG DE-59227 Ahlen Production hall 42.31 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2010 S&F Umwelttechnik AG DE-59602 Rüthen Production hall 30.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2010 HaWi Energietechnik AG DE-94099 Ruhstorf Open space 584.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, civil engineering work, DC cabling and connections
2010 SolarMarkt AG DE-79232 Buchheim shopping center 78.60 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, civil engineering work, DC cabling and connections
2010 SolarMarkt AG DE-92360 Bachhausen Open space 5,464.80 kWp Installation of substructure, installation of PV modules,
2010 Solarpower Project & Invest AG DE-18519 Miltzow Freifläche 698.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, civil engineering work, DC cabling and connections
2011 EuroSun AG ES-29590 Malaga logistics center 1100 kWp Assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, installation of Fraunhofer monitoring
2011 SolarMarkt AG DE-76743 Iffezheim open space 6890 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, civil engineering work
2011 Eoluz NV BE-2240 Massenhoven Production hall 233 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Eoluz NV BE-2470 Retie production hall 181 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Eoluz NV BE-3230 Houthalen Production hall 1121 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Würth Solar AG & Co.KG IT-30014 Cavarzere open space 2682 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections,
2011 Eoluz NV BE-8830 Hoogleede Production hall Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Eoluz NV BE-2990 Wuustwezel Production hall 103 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Eoluz NV BE-2990 Wuustwezel Production hall 172 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Eoluz NV BE-9880 Aalter Production hall 101 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Vento Ludens AG & Co.KG DE-09366 Niederdorf Open space 3048 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, civil engineering work
2011 Vento Ludens AG & Co.KG DE-89343 Jettingen Production hall 201 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Würth Solar AG & Co. KG DE-41066 Mönchengladb. Shopping center 98 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Tauber Solar ET AG DE-41747 Viersen Production hall 87 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2011 Tauber Solar ET AG DE-74078 Heilbronn Production hall 88 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2012 Würth Solar AG & Co.KG F-20720 Tallone open space 2617 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2012 EuroSun AG NL-1277 Homes Einkaufszentrum 72 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2012 EDTG Solar GbR DE-79427 Eschbach Aircraft hangar 141 kWp Installation of PV modules, installation of inverters, DC wiring and connections, AC wiring and connections
2012 Vento Ludens AG & Co.KG DE-89423 Peterswörth Freifläche 1405 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, civil engineering work
2012 Vento Ludens AG & Co.KG DE-26160 Bad Zwischenahn Freifläche 2096 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, civil engineering work
2012 Vento Ludens AG & Co.KG DE-06246 Milzau Freifläche 4640,30 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, civil engineering work
2013 Eoluz NV BE-1190 Brussels Production hall 2,316.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2013 IBC Solar AG DE-66625 Nohfelden-Sötern Open space 1,589.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2013 IBC Solar AG DE-67657 Kaiserslautern Open space 6,360.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, 2013 Eoluz LUX-8508 Redange-sur-Attert School 1,086.00 kWp
2014 RALOS New Energy UK Ltd. Woden Park - CF5 - Cardiff - UK Freifläche 4.992,00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2014 RALOS New Energy UK Ltd. Trequite - Cornwall PL143RQ - UK Freifläche10.988,00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2014 RALOS New Energy UK Ltd. Trewidland - PL14-Liskeard - UK Open Space 5,045.00 kWp Installation of substructure, installation of PV modules, installation of inverters, DC cabling and connections, AC cabling and connections. Make and connect stations, MSP cabling
2014 RALOS New Energy UK Ltd. Evesham - Worcestershire WR11 8DX - UK Freifläche 3.740,00 kWp Installation of substructure, installation of PV modules,
2014 RALOS New Energy UK Ltd. Dyke Dyke - Carmarthenshire SA18 - UK Freifläche 13.521,00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2014 RALOS New Energy UK Ltd. Isle Of Wight - Newport PO30 - UK Freifläche 6.979,00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2015 Conergy UK Ltd. - Winnards Perch - Cornwall TR9 6DG Free space 4,453.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2015 Conergy West Sussex Ltd. - Dunkeswell - Honiton EX14 4RD open space 2,795.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2015 Conergy West Sussex Ltd. - Garvinack - Truro TR4 9NF open space 9,577.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2015 Vento Ludens AG & CO.KG - DE-17321 Bergholz Freifläche 9,767.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2015 RALOS New Energy UK Ltd. - Pencoose Truro TR37DN Freifläche 8.145,00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling
2016 Conergy UK Ltd. Chard - TA20 3DB Somerset Open Space 3,017kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling, civil engineering: foundations; Construction road, fence installation
2016 Conergy UK Ltd. Spear Hill - RH 20 3BA Pulborough Open Space 4,951.44kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, MSP cabling, civil engineering: foundations; Construction road, fence installation
2016 actensys AG D-39175 Körbelitz open space 7,000.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2016 Young Energy D-38828 Wegeleben Farm building 1,204.00 kWp AC wiring and connectors, station location and connection, MSP wiring
2016 Young Energy D-39365 Eilsleben Farm building 1,903.00 kWp AC wiring and connectors, station location and connection, MSP wiring
2017 D- various locations open space / free-standing pv plant maintenance and repairs
2017 DE-68199 Mannheim wholesale market 749.00 kWp Conception and planning PVA, assembly substructure, assembly inverter, DC cabling and connections, AC cabling and connections, installation monitoring
2017 DE-79194 Gundelfingen wholesale market 744.00 kWp Conception and planning PVA, assembly substructure, assembly inverter, DC cabling and connections, AC cabling and connections, installation monitoring
2018 DE-40235 Düsseldorf wholesale market 144.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2018 BE-1190 Brussels Production hall 2,930.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2018 BE-2400 Mol swimming pool 128.00 kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2019 DE-Albwerk Elektro- und Kommunikationstechnik AG - 6 different locations in Baden-WürttePARAMOUNTrg Installation of substructure, installation of PV modules, installation of inverters, DC cabling and connections, some AC cabling and connections
2019 DE-86362 Weilheim - E.ON Energie Deutschland AG - commercial roof 165kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2019 DE-75015 Bretten - E.ON Energie Deutschland AG - shopping center 300kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2020 DE-87600 Kaufbeuren - shopping center 400kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2020 DE-88433 Schemmerhofen - Freifläche / free-standing pv plant 750kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, underground cable engineering and foundations
2020 DE-83646 Bad Tölz - industrial building 214kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2020 DE-92334 Schweigersdorf - free-standing pv plant 9,999kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, underground cable engineering and foundations
2020 DE-92533 Wernberg - Industrial building 158kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2020 DE-94501 Beutelsbach - free-standing pv plant 1,450kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2020 DE-94501 Beutelsbach - Freifläche / free-standing pv plant 1.408kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2020 DE-94474 Vilshofen - free-standing pv plant 7,980kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2020 DE-95497 Goldkronach - Industrial building 686kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections
2020 DE-92355 Vogelbrunn - Freifläche / free-standing pv plant 750kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, underground cable engineering and foundations
2020 DE-65321 Heidenrod - Freifläche / free-standing pv plant 750kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections, AC cabling and connections, setting up and connecting stations, underground cable engineering and foundations
2021 DE-84364 Bad Birnbach - Freifläche/free-standing pv plant 750kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94522 Wallersdorf - free-standing pv plant 750kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94127 Neukirchen am Inn - Freifläche / free-standing pv plant 2.772kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94554 Langenisarhofen - free-standing pv plant 617kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94518 Spiegelau - free-standing pv plant 720kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94154 Neukirchen vorm Wald - free-standing pv plant 2,499kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections,
2021 DE-94496 Oberiglbach - Freifläche/free-standing pv plant 2.035kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-94486 Osterhofen - free-standing pv plant 194kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections,
2021 DE-92449 Steinberg - free-standing pv plant 749kWp Assembly of substructure, assembly of PV modules, assembly of inverters, DC cabling and connections
2021 DE-90402 Nuremberg - rooftop system Civil engineering, AC wiring and connectors,

You can find out more about our completed projects at References.

RESIDENTIAL


2015 Steigerwald Wohnbau AG & Co.KG DE-72649 Wolfschlugen Electrical installation apartment building
2015 Steigerwald Wohnbau AG & Co. KG DE-70794 Filderstadt Electrical installation of apartment buildings and terraced houses
2017 Apartment building DE-73760 Ostfildern Electrical installation apartment building
2017 Temporary residential container facility DE-47495 Rheinberg electrical installation
2018 Apartment building 18 residential units DE-73760 Ostfildern-Kemnat electrical installation
2021 Apartment building 7 residential units DE-70619 Heumaden Electrical installation apartment building

You can find out more about our completed projects at References.

PUBLIC FACILITIES


2019-2020 DE-73770 Denkendorf - SCHATZ projectbau AG - nursing home electrical installation
2020-2021 DE-71254 - Dormitory with care facilities electrical installation

You can find out more about our completed projects at References.

Share by: